CNEWA

Stories From the Field:
Warm and Dry in Bethlehem

Improving an old school building

We received the following good news from Laura Schau-Tarazi in our Jerusalem office:

Every winter, students and teachers of the Rosary Sisters School in Bethlehem had to brave the harsh conditions of the second and third floor corridors, which were open to the rain and covered with large puddles due to the lack of windows. Many classes are held on both floors and hundreds of students and teachers use the corridor daily in order to get to and from class. All of the students and teachers needed to wear winter coats, hats and gloves every day for the entire season. Teachers complained that the open corridors created cold, damp conditions in the classrooms, putting everyone at risk for contracting viruses, colds and the flu. The school building is well over 100 years old and the need for rehabilitation work continues to be a serious issue, especially since the building must meet modern safety codes.

The sisters appealed to CNEWA to help the school enclose the corridors with panels containing large aluminum windows. With a generous grant from the Representative Office of Germany in Ramallah, we were able to procure and install the windows that sealed off both corridors.

Plaster and paint were also applied to the problem areas. Additionally, the project hired three local laborers as well as a local engineer who inspected the work.

The work was completed during the Christmas break, allowing students and teachers to return to a warmer, dryer school!

Recent Posts

Get to know us and stay informed about the impact your support makes.

Nous constatons que votre préférence linguistique est le français.
Voudriez-vous être redirigé sur notre site de langue française?

Oui! Je veux y accéder.

Hemos notado que su idioma preferido es español. ¿Le gustaría ver la página de Asociación Católica para el Bienestar del Cercano Oriente en español?

Vee página en español

share